1
/
of
4
LUNA LASH
Flat Lashes 0.15mm
Flat Lashes 0.15mm
Regular price
$18.50 AUD
Regular price
Sale price
$18.50 AUD
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
Upgrade your lash game with our Flat Lashes. These lashes have a unique flattened base, making them ultra-soft and lightweight. The concave surface allows for longer-lasting adhesion, while the wide selection of curls ensures a perfect fit for any eye. Expertly crafted for a classic lash set.
Length : Mix (8-15mm)
Thickness : 0.15mm
12 rows
Share
